Place of Origin : Binzhou,China
Delivery Terms : CFR
Delivery Time : 60 DAYS
Product Capacity : 150 SETS
Payment Terms : T/T,L/C
Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.
Design technique of precasting girder mould
The mould is integrated designed and stress analyzed in concordance