This project is located in a national park in Kinshasa, the capital city of Democratic Republic of the Congo. It is an international electromechanical & hydropower general contracting project of Getai Hydropower as a hydropower equipment supplier. The scope of equipment supply includes: hydro-turbine, generator, excitation device, governor, water supply and drainage system, automatic control system, high and low-voltage systems, etc.
Power Station Basic |
|
Turbine: |
Generator: |
Rated Head: 4m |
Rated Voltage: 400V |
Rated Output: 1052Kw |
Rated Flow: 29.8 M3 /s |
Rated Efficiency: 94% |
Frequency: 50Hz |
Rated Speed: 150 R / Min |
Rated Power: 1000KW |